This winter has reinforced in me the need to insulate my
work space. When it’s zero outside and below zero in the shop it’s easy to tell
that something has to change!
Higher on the priority for this spring will be to get some
insulation up on the walls and get it covered by the old boards we have from the
bunkhouse we tore down at the old barn site. Something has to change, even if
slowly.
I have been thinning down my “surplus” of items. I no longer
have 3 forges, just one. The dark room has went on to someone that has the room
and time to make use of it, and I’m gaining room a bit here and a bit there.
The project list is still every growing but that too is getting
more organized, with set goals and time lines… as much as the weather will
allow at least. And, I hope to be back on a more regulated schedule of blogging
as well.